LandFeas

Commercial Real Estate · Land Due Diligence

Precision Land Due Diligence & Feasibility

Calculate binding entitlement constraints, buildable envelopes, FAR limits, and setback deductions in real-time.

Envelope Inputs

Real-time

Setbacks (ft)

Default assumes a square parcel from net buildable area.

Lot Envelope Diagram

2D Plan
209′ W209′ D189′ × 164
LotSetback zoneBuildable envelope

Calculation Results

Binding: Coverage governs

Net Buildable Area

43,560 sq ft

1 acres after deductions

Max GFA (FAR Method)

87,120 sq ft

Net × FAR 2

Max Footprint (Coverage)

17,424 sq ft

40% of net area

Setback Envelope Area

30,894 sq ft

188.7′ × 163.7′

Practical Max Footprint

17,424 sq ft

min(Coverage, Setback Envelope)

Binding Max GFA

69,696 sq ft

min(FAR GFA, Footprint × 4 stories)

MetricValueRole
Gross Lot Area43,560 sq ftInput base
Height-limited GFA69,696 sq ftFootprint × stories
Binding ConstraintCoverageGoverning entitlement

FAR Method

Net buildable area × FAR cap yields maximum allowable gross floor area.

Coverage Method

Lot coverage % defines the maximum footprint before height multiplies program.

Binding Detection

Automatically identifies whether FAR, coverage, setbacks, or height governs.